panovista.de - Panoramic Photography

RSS Feed Subscribe

Citizens Bridge Altusried

By mt on 6 July 2009

The first citizen of Bavaria bridge linking the hamlet of fishermen and PFOS above the Iller Altusried eruption. What makes this 84 meter long suspension bridge, however, that it was built by volunteers 30 hours in some 1,200 workers.

Since the end of the Second World War to 2001's there were between Altusried and Dietmannsried, a privately operated ferry service, which was used by hikers and cyclists. When this has been discontinued, was the great demand by hikers and cyclists is an important argument to advance the construction of a bridge over the river Iller.

Since the formal inauguration of the bridge in August 2007, the "Upper Allgäu Loop Trail" are again committed throughout. The Swabian St. James pilgrimage has found that a shorter and more attractive guidance.

Altusried citizens BridgeClick here to start

Data from the Bridge

  • 84 m span
  • 1.5 m tread
  • 33.2 tons of steel
  • 2750 screw

The panorama consists of 114 individual photographs, the 360 ° to a Spherical Panorama in HDR technology has been put together.

Options:
  • email
  • Print
  • PDF
  • RSS
  • del.icio.us
  • Facebook
  • Twitter
  • Google Bookmarks
  • Live
  • Yahoo! Bookmarks
  • MySpace
  • Digg
  • Mixx
  • Sphinn
  • Blogosphere News
  • MisterWong.DE
  • SphereIt
  • Technorati
  • MSN Reporter
  • Slashdot

Write a response